Regular Scope of Work

Project Component

Project Component

2.15 MLD CETP & it's upgraded module of 2.35 MLD CETP installed under IIUS of Govt of India has been under operation since October 2013 at full load as per directions of UPPCB to ensure treated effluent well within the prescribed norms of UPPCB. As per policy of CETP’s Board, no production capacities are increased by any member unit and the upgraded module is only serving in series to additionally treat the effluent from its old module and adequately handle the peak loads if any sometimes or during maintenance in the old module.

Hazardous Waste

Hazardous Waste

UPTCC is dumping its solid waste into a Secured Land Facility at UPSIDC leather Technology Park Banthar Unnao.

Chrome Recovery Plants

UTPCC is monitoring individual Chrome Recovery Plants of each user industry of CETP except the defaulter tannery Iqbal Leather limited.

Operate a primary ETP

User industries of CETP also monitor primary ETPs of member units which are installed to treat the effluent up to the desired standards of UPPCB before discharging their trade effluent into the CETP.